20. Calves, Sheep, and Goats— Chart of Guidelines for Distances for Rails and Other Facilities

TABLE 4.—GUIDELINES FOR DISTANCES IN CALF, SHEEP, AND GOAT SLAUGHTERING ESTABLISHMENTS

ItemVertical distanceHorizontal distance
Bleeding rail for calves (distance from top of rail to point of application of shackle to shackled foot—2 feet 6 inches (.8 m)).11 feet
(3.3 m)
Bleeding rails if only sheep or goats are slaughtered9 feet–11 feet
(2.7 m–3.4 m)
Dressing rail (trolley length—1 foot (.3 m))8 feet 6 inches
(2.6 m)
Cooler rails, calf carcasses (trolley length—1 foot (.3 m)).8 feet 6 inches
(2.6 m)
Cooler rails, sheep or goat carcasses (trolley length—1 foot (.3 m)).7 feet 6 inches–8 feet 6 inches
(2.3 m–2.6 m).
Moving equipment
Vertical of rail to edge of viscera inspection stand2 feet
(.6 m)
Length of rail from point of evisceration to point where carcass inspection is completed6 feet
(1.8 m)

Hogs—Additional Facilities Guidelines

 

In addition to the general guidelines in sections 1 through 8, the following guidelines apply to those establishments that slaughter hogs. Consider these addition al guidelines when building or modifying an establishment that slaughters hogs.

 

21. Livestock Pens

  • To prevent hogs from overheating, p en s for hogs should have either a roof for shelter or a shower system to keep the animals cool in weather with temperatures greater than 70 °F (21 °C).

22. Location of Certain Operations

  • To prevent contamination , the following equipment and operations should be located in an area or areas separate from the carcass dressing area, except for the openings for access and passage of carcasses:
    • Hoisting, sticking, and bleeding.
    • Scalding vat.
    • Dehairing machine located within a curbed area having non clogging drainage outlet.
    • Gambrelling table.
    • Singeing operations